Your parking lot starting to show cracks or uneven spots, but you don’t want to shut down for a full replacement? Mill and pave is the practical way to get a smooth, fresh surface without the big disruption. At WestShore Paving, we’ve been doing this for long time in Tampa Bay. We just finished a mill and pave for the Laurel Green Village HOA in Trinity, FL—two days, and their lot was back in action. The board was relieved because residents barely noticed the work. This page explains what we’ve learned from jobs like that. No big promises, just clear facts for Tampa property owners who need their lots reliable. Let’s see if it’s the right fit for you.
What Mill and Pave Means for Tampa Properties
Mill and pave removes the top worn layer of asphalt and replaces it with new. It’s resurfacing that saves time and money compared to ripping everything out. The National Asphalt Pavement Association says this method extends lot life 10–15 years when the base is sound. For the Laurel Green HOA in Trinity, we milled off the old surface, fixed drainage issues, and paved fresh asphalt. No need for a full rebuild.
Here’s what mill and pave Tampa includes:
| Mill and Pave Tampa Step | What It Does |
|---|---|
| Milling the top layer | Removes 1–2 inches of damaged asphalt |
| Base inspection | Checks for deeper issues |
| Repairs if needed | Fills cracks or adjusts grade |
| New asphalt paving | Lays hot-mix for smooth finish |
| Compaction and sealing | Ensures durability |
This process fits Tampa’s busy properties. For related work, look at our asphalt overlay page.
The Mill and Pave Tampa Process in Action
We start with a walk-through. For Laurel Green in Trinity, we saw surface wear from traffic but solid base. Day one: milled the old layer, cleaned debris, fixed minor cracks. Day two: paved new asphalt, rolled it tight, added lines. The HOA president said it was the least hassle they’ve had with contractors.

Steps we follow for
- Site check — Measure, test base stability.
- Mill old surface — Use machines to grind top evenly.
- Prep and repair — Fill voids, improve drainage.
- Pave hot-mix — Lay and grade new asphalt.
- Compact and finish — Roll for density, seal edges.
Two days for Laurel Green kept disruption low. Residents parked normally by evening.
When Mill and Pave Tampa Is the Best Choice
If your lot has surface problems but the foundation holds, mill and pave works. Full replacement is for when base fails from years of neglect. For Laurel Green Village HOA, surface cracks from sun and rain made mill and pave ideal. Saved them 40 % over replacement.
Here’s how to know if it’s fits:
| Lot Condition | Best Approach | Why in Tampa |
|---|---|---|
| Surface cracks, fading | Mill and pave | Quick fix for UV wear |
| Base soft, deep holes | Full replacement | Addresses soil issues |
| Moderate damage, good drainage | Mill and pave | Cost-effective in rain-prone areas |
| New build | Full paving | Starts from scratch |
The Trinity project had moderate damage—mill and pave was perfect. For deep fixes, see our removal and replacement page.
Tampa Weather and Mill and Pave Durability
Tampa heat expands asphalt, rain erodes it. We use mixes that flex with temperature changes. For high-traffic like Laurel Green, we add thickness. The Federal Highway Administration notes proper compaction prevents rutting in humid climates. The Trinity lot took a storm right after—held up fine, no washout.
Benefits of Mill and Pave for Commercial and HOA Properties
This method doesn’t just repair—it improves. Smooth surface reduces vehicle wear. New grade fixes water pooling. For Laurel Green Village, residents noticed fewer bumps. It’s safer, looks professional. Property values rise with better curb appeal.
Why WestShore Paving for Mill and Pave Tampa
Large companies delay. Small operators lack gear. We’re Tampa local, finish fast like the 2-day Trinity job. Twenty-two years mean we know how our weather affects asphalt. HOA boards tell us our mill and pave jobs last longer without callbacks.
FAQs
How long does mill and pave take in Tampa?
1–3 days for most lots. Laurel Green was two.
Is mill and pave cheaper than full replacement?
Yes, 40–60 % less. Good for sound bases.
Can you mill and pave without closing the lot?
Usually. We work sections or off-hours.
Does mill and pave work for heavy traffic?
Yes. We use commercial-grade mix.
How soon can we use the lot after mill and pave?
24–48 hours for light use.
Why West Shore Paving?
Local. Reliable. Experienced. Call Jacob at 352-587-4016.
Keep This Guide Fresh
Tampa trends evolve. Update every 6–12 months with new projects like Laurel Green.
Resurface Your Lot Today
Mill and pave revives tired lots fast, like our Laurel Green Village HOA job in Trinity. It’s durable, affordable for Tampa properties. Ready for yours? Call 352-587-4016, email jacob@westshorepaving.com, or hit our contact page. Let’s get it done.










